ShadeschoolFor the built environment

Project module

Installation Methodology — Project Module

Project Delivery

Method over muscle: sequencing, trade coordination and the method-statement discipline that installs shading right, safe and once. Installation is where every upstream decision is graded in public: the pocket sized in BLS-06, the power planned in BLS-05, the numbers surveyed in PRJ-03 — all meet a person on a ladder with a programme behind schedule.

Format

Digital download (PDF). 8 pages (PDF).

A non-CPD reference product. It does not carry CPD points.

Watch the trailer

Trailer coming soon