Sun-control tool · Compliance
SANS 10400-XA Readiness Quick-Check
A 10-point readiness check of a design against the fenestration and shading logic of SANS 10400-XA:2026 (Edition 3).
Results
Results appear here after you select "Work it out".
| Item | Value | Unit | Note |
|---|
Report: SANS 10400-XA Readiness Quick-Check
| Item | Value | Unit | Note |
|---|
| Item | Value | Unit | Note |
|---|
Method
Score = ticked items / 10 x 100, rounded to a whole percent. Band: 70% and up = most items addressed; 40% and up = gaps to close; below 40% = early stage. The band is a readiness indicator, not a verdict.
Assumptions and limitations
- Each item is self-assessed by the user.
- All items carry equal weight.
- This result was produced with a design-aid tool from the values shown under Inputs. It is an aid to judgement, not a compliance certificate and not a rational design. A competent person must check the real project against the licensed standard and the project drawings.
References
- SANS 10400-XA:2026 (Edition 3), clause 4: three alternative routes (4.2, 4.3, 4.4). Read the requirement in your own licensed copy.
- SANS 10400-XA:2026 (Edition 3), clauses 5.2.1 and 5.2.2: shading. Read the requirement in your own licensed copy.
- SANS 10400-XA:2026 (Edition 3), clauses 5.3.1 to 5.3.5 and Table 4: fenestration, per storey against nett floor area. Read the requirement in your own licensed copy.
What this does not tell you
- Whether the building complies. Only a competent person checking the real project against the licensed standard can say that.
- Any U-value or SHGC limit: those are in your own licensed copy of the standard.