Sun-control tool · Compliance

SANS 10400-XA Readiness Quick-Check

A 10-point readiness check of a design against the fenestration and shading logic of SANS 10400-XA:2026 (Edition 3).

Inputs

Results

Results appear here after you select "Work it out".

Assumptions and limitations

  • Each item is self-assessed by the user.
  • All items carry equal weight.
  • This result was produced with a design-aid tool from the values shown under Inputs. It is an aid to judgement, not a compliance certificate and not a rational design. A competent person must check the real project against the licensed standard and the project drawings.

References

  • SANS 10400-XA:2026 (Edition 3), clause 4: three alternative routes (4.2, 4.3, 4.4). Read the requirement in your own licensed copy.
  • SANS 10400-XA:2026 (Edition 3), clauses 5.2.1 and 5.2.2: shading. Read the requirement in your own licensed copy.
  • SANS 10400-XA:2026 (Edition 3), clauses 5.3.1 to 5.3.5 and Table 4: fenestration, per storey against nett floor area. Read the requirement in your own licensed copy.

What this does not tell you

  • Whether the building complies. Only a competent person checking the real project against the licensed standard can say that.
  • Any U-value or SHGC limit: those are in your own licensed copy of the standard.